By Steven G. Mehta

A very interesting arbitration case just came down in California.  It holds that even if you are a nonsignatory to the arbitration agreement, you may be able to enforce the agreement if is within the basis of the arbitration agreement.  In addition, non-signatories to the arbitration agreement may also be forced to be subjected to arbitration.

This is a novel case and even looking  at the opinion, hotly contested by the Justices themselves.  Here is the opinion.

Filed 3/29/11

CERTIFIED FOR PUBLICATION

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

SECOND APPELLATE DISTRICT

DIVISION THREE

JSM TUSCANY, LLC et al., Petitioners, v. THE SUPERIOR COURT OF LOS ANGELES COUNTY, Respondents;

NMS PROPERTIES, INC., et al.,

Real Parties in Interest.

B227360

(Los Angeles County

Super. Ct. No. BC432260)

ORIGINAL PROCEEDINGS in mandate. Kevin C. Brazille, Judge. Petition denied with directions.

Tourtelot & Butler and Robert H. Tourtelot for Petitioners.

No appearance for Respondents.

Manly & Stewart, John C. Manly and Morgan A. Stewart for Plaintiffs and Real Parties in Interest.

_______________________________________

In these writ proceedings, we consider the trial court’s denial, without prejudice, of petitioners’ motion to compel arbitration pursuant to the provisions of three separate, but substantially identical, real estate purchase contracts. Petitioners are twelve of the twentyseven defendants named in the first amended complaint (the operative pleading before us) filed by the four plaintiffs, N. Neil Skekhter; NMS Properties, Inc.; 15394 NM, LLC; and NMS/JSM San Lorenzo, LLC.

Plaintiffs’ complaint, although pleading some sixteen causes of action, essentially seeks recovery of damages and other relief from the several defendants for their breach of the three real estate sales contracts (hereinafter, PSAs) and the failure of some of the defendants to meet the requirements of three related Deed Restriction agreements that those defendants had entered into with the City of Santa Monica, and as to one of which two of the plaintiffs, 15394 NM and NMS/JSM San Lorenzo, claim to be third-party beneficiaries.

The three PSAs each contained a broad arbitration clause which the petitioners moved to enforce. The trial court denied the motion to compel arbitration on the grounds that not all of the plaintiffs and only a small number of the defendants were actually signatories to the PSAs. In addition, the Deed Restriction agreements entered into by several of the defendants and the City of Santa Monica contained no arbitration clause, and the trial court concluded that those agreements were not dependent on or intertwined with the PSAs, thus giving rise to non-arbitrable disputes.

After reviewing the record in this factually complex matter, we conclude that the trial court did not have before it sufficient information to determine whether plaintiffs should be compelled to arbitrate and therefore properly denied the motion to compel without prejudice. We will therefore deny the petition and remand the matter with directions.

FACTUAL AND PROCEDURAL BACKGROUND

Preliminarily, we note that while, in broad outlines, this case appears to be a dispute between Jones and Jones-related entities on one side and Shekhter and Shekhter-related entities on the other, this is not necessarily the case. The Jonesrelated entities generally include “JSM” in their names, while the Shekhter-related entities begin with “NMS.” One of the plaintiffs, however, is named NMS/JSM San Lorenzo, a name which suggests that, perhaps, at one point, Jones and Shekhter may have been in business together. In any event, it is apparent that the NMS/JSM San Lorenzo entity is now aligned with Shekhter and the other Shekhter-related plaintiffs.

JSM Construction, a Jones-related entity, was an active real estate developer in the City of Santa Monica (the City). In or about 2004 and 2005, JSM Construction was granted administrative approval to develop four mixed-use buildings, each to include dozens of residential rental units. The properties were to be located at 626 Broadway, 1548 Sixth Street, 1418 Seventh Street, and 1539 Fourth Street in the City. The City’s administrative approvals were subject to certain conditions, one of which related to the provision of affordable housing units. JSM Construction could satisfy these conditions by paying a in-lieu fee, dedicating on-site affordable housing units in each of the projects, constructing off-site affordable housing units, or acquiring land for affordable housing. As we shall soon discuss, JSM Construction chose to satisfy this obligation by means of the construction of off-site affordable housing units.

At approximately the same time, Jones contracted to sell to Shekhter, for $4,000,000, a “deed restricted” affordable housing apartment building in the City. The contract was originally dated November 11, 2004, and pertained to the sale of “1244 [Sixth] Street, or, in the sole discretion of Seller, such other property reasonably comparable in size and location developed by Seller [with a deed restricted affordable housing apartment building].” On or about September 15, 2005, the agreement was amended to designate the property to be sold as the property located at 711 Colorado. Pursuant to the 711 Colorado PSA, Shekhter paid a $500,000 deposit toward the total purchase price of $4,000,000. The PSA provided that Jones was to develop and construct a low-income deed restricted apartment building on the 711 Colorado property, and that escrow would close on the sale to Shekhter within 60 days after the City issued a certificate of occupancy for the project.

JSM Construction then agreed with the City that it would satisfy its affordable housing requirements with respect to the properties at 626 Broadway, 1548 Sixth Street, 1418 Seventh Street, and 1539 Fourth Street, by constructing the necessary amount of affordable housing units at 711 Colorado. Pursuant to the City’s requirements, a deed restriction was to be recorded on the property to insure that the off-site affordable housing units would be maintained for 55 years.

JSM Construction’s agreement with the City was memorialized in a Deed Restriction agreement dated April 2, 2007. Pursuant to the Deed Restriction agreement, JSM Construction and JSM Modena, the Jones-related entity which, by this time, owned 711 Colorado, agreed to “provide and maintain” 26 affordable housing units on the 711 Colorado property. However, the Deed Restriction agreement did not set forth any particular schedule for performance; it did not indicate when (if ever) the affordable housing units would be built. Instead, the Deed Restriction agreement provided that it ran with the property, and would “apply to and bind the heirs, successors and assigns of all the parties hereto and shall run with and burden the 711 Colorado Property for the benefit of the City, the public, and surrounding landowners . . . .  [JSM Modena] shall expressly make the conditions and covenants contained in this Agreement a part of any deed or other instrument conveying any interest in the property.”

By this Deed Restriction agreement, JSM Construction was permitted to develop the four properties at 626 Broadway, 1548 Sixth Street, 1418 Seventh Street, and 1539 Fourth Street as market-rate rental apartment buildings, as the City’s requirements relating to affordable housing were to be satisfied by the affordable housing to be constructed on JSM Modena’s property at 711 Colorado. For this reason, we refer to the four properties as the Modena-benefitted properties, and 711 Colorado as the Modena affordable housing property. Two of the Modena-benefitted properties, 1548 Sixth Street and 1539 Fourth Street, are now owned by two (Shekhter-related) plaintiffs in this case, NMS/JSM San Lorenzo and 15394 NM, respectively. The remaining two Modena-benefitted properties are owned by Jones-related entities (JSM Lugano and JSM Genoa). The record does not indicate how or when the Shekhterrelated plaintiffs became owners of two of the Modena-benefitted properties.

The affordable housing project was never constructed on the 711 Colorado property; the parties eventually agreed that the cost of construction would exceed the $4,000,000 original purchase price. On May 18, 2009, the parties entered into an amendment and assignment of the PSA. The amendment indicated that the sellers were now Jones and JSM Modena, while the buyer became Shekhter-related entity (and plaintiff) NMS Properties. Pursuant to the terms of the amendment, Jones would no longer construct the affordable housing project on 711 Colorado. Instead, the property to be conveyed would consist of the property itself, all plans and specifications for the construction of the affordable housing project, any development rights related to the development project, and Jones’s rights under agreements with architects, engineers, and consultants regarding the project. The purchase price was to consist solely of buyer’s assumption of a note (and security documents) on the property, and the $500,000 deposit was to be refunded at closing. Moreover, the parties would subsequently agree on a payment to be made by sellers to buyer to cover the costs of construction in excess of the original purchase price. Escrow was to close within five days of buyer giving notice that it was prepared to close, but not later than November 1, 2009.

We pause at this moment for two important points. First, the amendment indicates that, if there was no agreement reached on the amount of the excess costs to be paid by the sellers, the buyer could unilaterally terminate the terms of amendment, which would reinstate the terms of the initial agreement. There is no allegation, or evidence, that this was done. Instead, plaintiffs filed suit on the PSA as amended. Second, as expressed above, the Deed Restriction ran with the land. Thus, it was apparently contemplated at this point that NMS Properties, as the future owner of 711 Colorado, would be responsible for constructing the affordable housing project on that property in accordance with the Deed Restriction.

We have set forth the factual history of this dispute with regard to the 711 Colorado property. The dispute repeated with respect to two additional parcels, with one important difference: none of the properties benefitted by the other contemplated affordable housing projects are owned by plaintiffs; instead, they are all owned by defendants. We discuss these properties briefly.

In November 2004, Jones agreed to sell to Shekhter the property at 1514 Seventh Street (which, before the transfer, became owned by JSM Tuscany) on which there was to be constructed a deed restricted affordable housing project, for $3,750,000, including a $500,000 deposit. On March 15, 2007, JSM Construction and JSM Tuscany entered into a Deed Restriction agreement with the City similar in terms to the Modena Deed Restriction. In this case, the four Tuscany-benefitted projects were located at 606 Broadway, 1420 Fifth Street, 1442 Fifth Street, and 507 Wilshire Boulevard. These projects are all owned by Jones-related entities, JSM Positano, JSM San Marco and JSM Arrezo. On May 18, 2009, the 1514 Seventh (Tuscany) PSA was amended in terms virtually identical to that of the 711 Colorado (Modena) PSA — the sellers were now Jones and JSM Tuscany; the buyer was now NMS Properties; the property to be conveyed was the 1514 Seventh property with all plans, development rights, and other paperwork; the sale price would be the assumption of an existing note; the deposit would be returned; there would be an additional payment from the seller for the construction costs in excess of the original sales price; and the agreement would close five days after buyer was prepared to do so, but no later than November 1, 2009.

In November 2006, Jones agreed to sell to Shekhter the property at 1437 Fifth Street (which, before the transfer, became owned by JSM Spoleto) on which there was to be constructed a deed restricted affordable housing project, for $4,250,000, including a $750,000 deposit. On May 18, 2009, the 1437 Fifth PSA was amended in terms virtually identical to that of the other two PSAs — the sellers were now Jones and JSM Spoleto; the buyer was now NMS Properties; the property to be conveyed was the 1437 Fifth property with all plans, development rights, and other paperwork; the sale price would be the assumption of an existing note; the deposit would be returned; there would be an additional payment from the seller for the construction costs in excess of the original sales price; and the agreement would close five days after the buyer was prepared to do so, but no later than November 1, 2009. On June 18, 2009, JSM Construction and JSM Spoleto entered into a Deed Restriction agreement with the City similar in terms to the Modena and Tuscany Deed Restrictions. In this case, the three Spoleto-benefitted projects were located at 1241 Fifth Street, 1427 Seventh Street, and 525 Broadway. These projects are all owned by Jones-related entities, JSM Roma, JSM Lucca and a Prudential/JSM entity, respectively.

According to plaintiffs, defendants breached the amended PSAs, by failing to turn over the properties and related documents as agreed, and failing to refund the deposits. This is not meant, however, to be a comprehensive enumeration of defendants’ alleged wrongdoing.

Because the facts of this case are so complex, we now briefly summarize the roles played by all parties. (1) Plaintiff Shekhter was the original buyer in all three PSAs; by amendment to the PSAs, he assigned his rights under each PSA to NMS Properties. Although Shekhter appears to have an interest in the other plaintiff entities, it is not entirely clear on what basis he seeks relief as an individual – particularly with respect to his breach of contract causes of action. (2) Plaintiff NMS Properties was, by virtue of assignment from Shekhter, the buyer of the three (Modena, Tuscany and Spoleto) affordable housing properties (land only), pursuant to the amended PSAs. (3) Plaintiffs 15394 NM and NMS/JSM San Lorenzo owned Modena-benefitted properties, identified in the Modena Deed Restriction agreement as properties which could be developed as market-rate rentals without affordable housing units due to the construction of the Modena affordable housing project at 711 Colorado.

We now discuss the defendants and petitioners. (1) Defendant and petitioner Jones was a seller of the three affordable housing properties, pursuant to the original and amended PSAs; he also has an interest in the other defendants and petitioners. (2) Defendants and petitioners JSM Modena, JSM Tuscany and JSM Spoleto were additional sellers of the three affordable housing properties, pursuant to the amended PSAs; they were also parties to the Deed Restriction agreements with the City. (3) Defendant and petitioner JSM Construction was a party to the Deed Restriction agreements with the City. (4) The remaining defendants and petitioners each own properties, identified in the Deed Restriction agreements, which were to be benefitted by the affordable housing projects. JSM Lugano and JSM Genoa were Modenabenefitted properties; JSM Positano, JSM San Marco and JSM Arrezo were Tuscany-benefitted properties; and JSM Roma and JSM Lucca were Spoleto-benefitted properties. These benefitted property defendants were sued on the basis that they received wrongfully-diverted funds (the deposits made by plaintiffs under the PSAs) and for breach of the Deed Restriction agreements.

The plaintiffs filed this action on February 24, 2010. The first amended complaint (which is the one with which we are concerned) was filed on April 30, 2010. Plaintiffs’ 66-page first amended complaint alleges 16 causes of action, sounding in tort and contract. Plaintiffs’ opposition to the motion to compel, and their opposition to petitioners’ writ petition, narrow their focus to four bases for relief: (1) claims for breach of the PSAs; (2) claims for breach of the Deed Restriction agreements; (3) claims that defendants used the wrongfully-retained deposit amounts (from the PSAs) to develop their other projects; and (4) claims that defendants wrongfully encumbered the Tuscany and Modena properties (recording deeds of trust in favor of Robhana, Inc. and Charles Dunn Capital, Inc.) which should have been clear of trust deeds and transferred to plaintiffs pursuant to the amended PSAs. Plaintiffs also named as a defendant Integrated Lender Services, the trustee on that deed of trust. We refer to these three defendants collectively as the Trust Deed Defendants. Plaintiffs allege that all defendants but the three Trust Deed Defendants have an alter ego relationship with Jones and are allegedly merely conduits through which he conducts his construction and development business.

On April 16, 2010 (two weeks prior to the filing of the first amended complaint), the Prudential defendants filed a motion to compel arbitration, based on the arbitration clause in the PSAs. Petitioners filed a notice of joinder in that motion on June 17, 2010. Each of the PSAs contained the same very broad arbitration clause: “Any disagreement or dispute between the Parties with reference to the interpretation, performance or breach of any provisions of the Agreement, this Addendum, or any Exhibit to the Agreement or this Addendum, shall, at the request of either Party, be resolved by binding arbitration, and any award shall include reasonable attorney’s fees and costs to the prevailing party. The arbitrator shall apply California substantive law and the California Evidence Code to the proceeding. The arbitrator shall not have the power to commit errors of law or legal reasoning, nor shall the arbitrator have the power to make an award that would not have been available in a Court of Law had the Parties chosen to litigate rather than arbitrate. The award may be vacated or corrected pursuant to California Code of Civil Procedure, Sections 1286.2 or 1286.6 for any such error or for any such award in excess of the arbitrator’s power. Each Party to such arbitration shall have all rights of discovery permitted by the California Code of Civil Procedure, and in this regard, the Parties hereby incorporate and make a part hereof the provisions of Code of Civil Procedure, Section 1283.05 and 1283.1.

“NOTICE: BY INITIALING IN THE SPACE BELOW YOU ARE AGREEING TO HAVE ANY DISPUTE ARISING OUT OF THE MATTERS INCLUDED HEREIN DECIDED BY NEUTRAL ARBITRATION AS PROVIDED BY CALIFORNIA LAW AND YOU ARE GIVING UP ANY RIGHTS YOU MIGHT POSSESS TO HAVE THE DISPUTE LITIGATED IN A COURT OR JURY TRIAL. BY INITIALING IN THE SPACE BELOW YOU ARE GIVING UP YOUR JUDICIAL RIGHTS TO DISCOVERY AND APPEAL, UNLESS THOSE RIGHTS ARE SPECIFICALLY INCLUDED HEREIN. IF YOU REFUSE TO SUBMIT TO ARBITRATION AFTER AGREEING TO THIS PROVISION, YOU MAY BE COMPELLED TO ARBITRATE UNDER THE AUTHORITY OF THE CALIFORNIA CODE OF CIVIL PROCEDURE. YOUR AGREEMENT TO THIS ARBITRATION PROVISION IS VOLUNTARY.” (Italics added.)

The trial court ruled on the motion to compel arbitration on July 22, 2010. Noting that only two of the four plaintiffs and five of the twenty-seven defendants were signatory parties to one or more of the PSAs (the only agreements containing an arbitration clause) and concluding that some of the claims asserted by the plaintiffs did not arise from conduct involving the PSAs, the trial court denied the motion, without prejudice. It explained its reasoning, in part, as follows:

“Here, it is clear that the claims generally concern the [PSAs]. However, there are claims which also concern the restricted deed agreements entered with the [C]ity, which do not contain an arbitration clause, and cannot be deemed to fall within the ambit of the purchase and sale agreements. Thus, some claims are clearly arbitrable, while others are not. And, some parties are subject to arbitration, while others are not. This case is not one where application of the doctrine of equitable estoppel makes sense, given the existence of wholly distinct contract claims which are not subject to arbitration. Further, there is a very real possibility of conflicting rulings as to the entities which are not parties to these motions, and are not parties to the arbitration agreements. As such, this case is appropriately one where the Court must deny arbitration under CCP § 1281.2(c).”

Petitioners did not notice an appeal, but rather filed the pending petition for writ relief. Their petition raises issues involving unusual, if not novel, circumstances concerning the application of Code of Civil Procedure, section 1281.2, subdivision (c) as well as the needs of judicial economy.

ISSUES PRESENTED

There are essentially four issues presented by these writ proceedings. First, is relief by writ of mandate, rather than appeal, appropriate in the particular circumstances of this case? We conclude that it is. Second, may defendants who are not signatories to the agreements containing an arbitration clause enforce the arbitration clause contained therein against signatory party plaintiffs who have filed suit on claims arising under the agreements? Existing law establishes that they may. Third, may nonsignatory plaintiffs who have joined in the action to assert claims based upon or arising out of the alleged breach of the contracts containing the arbitration clauses also be compelled to arbitrate, even by defendants who are not themselves signatory parties to the contracts containing the arbitration clauses? We conclude, as a matter of first impression, that they may. Finally, are all of the causes of action alleged by plaintiffs, including those for breach of the Deed Restriction agreements, inextricably intertwined with the obligations under the PSAs? We conclude that, on the record before us, a definitive answer to that question is not possible.

DISCUSSION

1. Standard of Review

There are two different critical written agreements before us and there is no dispute as to their provisions. We are thus presented with legal issues to resolve, not factual ones. When “the language of an arbitration provision is not in dispute, the trial court’s decision as to arbitrability is subject to de novo review.” (Gravillis v. Coldwell Banker Residential Brokerage Co. (2006) 143 Cal.App.4th 761, 771.) Thus, in cases where “no conflicting extrinsic evidence is introduced to aid the interpretation of an agreement to arbitrate, the Court of Appeal reviews de novo a trial court’s ruling on a petition to compel arbitration.” (California Correctional Peace Officers Assn. v. State of California (2006) 142 Cal.App.4th 198, 204.)

This principle finds expression in many cases. (See, for extensive list of such authorities, Molecular Analytical Systems v. Ciphergen Biosystems, Inc. (2010) 186 Cal.App.4th 696, 707.) Thus, we review the trial court’s order under a de novo standard.

2. Review By Writ Is Appropriate

In Powers v. City of Richmond (1995) 10 Cal.4th 85, 113, our Supreme Court stated, “Mandate is available to review an appealable judgment only when the remedy by appeal would be inadequate or the issues presented are of great public importance and must be resolved promptly.” (Italics added.) The “or” is significant here, as it implies that even when the remedy by appeal would be adequate, writ review may nonetheless be available if the issues are important enough to require prompt resolution. Subsequent cases have confirmed this interpretation.

In Rodrigues v. Superior Court (2005) 127 Cal.App.4th 1027, the court was considering a writ petition from an order granting a motion to set aside a default and default judgment under Code of Civil Procedure section 473, subdivision (b). The order had granted relief based on a declaration of attorney fault by an attorney who was not licensed to practice in California. The issue was whether the mandatory relief provisions of Code of Civil Procedure section 473, subdivision (b) applied to foreign attorneys. (Rodrigues v. Superior Court, supra, 127 Cal.App.4th at p. 1029.) The court acknowledged that an order vacating a default judgment and setting aside the default is itself appealable. (Id. at p. 1032.) “However,” the court stated, “writ review of an appealable order is appropriate where it is necessary to resolve an issue of first impression promptly and to set guidelines for bench and bar. [Citations.] For these reasons, writ review is appropriate in the present case.” (Ibid.) Similarly, in Elden v. Superior Court (1997) 53 Cal.App.4th 1497, 1504, the court allowed writ review of an order denying a petition to confirm an arbitration award, as the petition raised a novel issue of law. The issues raised by the instant petition are similarly novel and important, rendering writ review appropriate.

3. Signatory Parties May Be Compelled To Arbitrate Their Claims
Against NonSignatory Parties.

 

“Generally speaking, one must be a party to an arbitration agreement to be bound by it or invoke it.” (Westra v. Marcus & Millichap Real Estate Investment Brokerage Co., Inc. (2005) 129 Cal.App.4th 759, 763 (Westra); Rowe v. Exline (2007) 153 Cal.App.4th 1276, 1284 (Rowe).) “There are exceptions to the general rule that a nonsignatory to an agreement cannot be compelled to arbitrate and cannot invoke an agreement to arbitrate, without being a party to the arbitration agreement.” (Westra, supra, 129 Cal.App.4th at p. 765; Rowe, supra, 153 Cal.App.4th at p. 1284.)

One pertinent exception is based on the doctrine of equitable estoppel. (Boucher v. Alliance Title Co., Inc. (2005) 127 Cal.App.4th 262, 268 (Boucher); Goldman v. KPMG, LLP (2009) 173 Cal.App.4th 209, 220 (Goldman); see generally, Knight, et al., Cal. Practice Guide: Alternative Dispute Resolution (The Rutter Group 2009) ¶¶ 5:266.10-5:266.25, pp. 5-189 to 5-192.) Under that doctrine, as applied in “both federal and California decisional authority, a nonsignatory defendant may invoke an arbitration clause to compel a signatory plaintiff to arbitrate its claims when the causes of action against the nonsignatory are ‘intimately founded in and intertwined’ with the underlying contract obligations.” (Boucher, supra, 127 Cal.App.4th at p. 271; Goldman, supra, 173 Cal.App.4th at pp. 217-218.) “By relying on contract terms in a claim against a nonsignatory defendant, even if not exclusively, a plaintiff may be equitably estopped from repudiating the arbitration clause contained in that agreement.” (Boucher, supra, 127 Cal.App.4th at p. 272; Goldman, supra, 173 Cal.App.4th at p. 220.) “The rule applies to prevent parties from trifling with their contractual obligations.” (Turtle Ridge Media Group, Inc. v. Pacific Bell Directory (2006) 140 Cal.App.4th 828, 833 (Turtle Ridge).)

In Boucher, supra, 127 Cal.App.4th 262, the plaintiff sued Alliance Title Company, Inc. (Alliance), and Financial Title Company (Financial) in connection with a purported breach of his employment agreement with Financial. (Id. at p. 265.) Both defendants petitioned to compel arbitration under an arbitration clause in the employment agreement. The trial court denied Alliance’s petition, on the ground that it was not a signatory to the employment agreement. The Court of Appeal reversed. The Boucher court concluded that, under federal law, a signatory to an arbitration clause may be compelled to arbitrate against a nonsignatory when the relevant causes of action rely on and presume the existence of the contract containing the arbitration provision. (Id. at p. 269.) In other words, a plaintiff who relies on the contractual terms in a claim against a nonsignatory may be precluded from repudiating the arbitration clause in the contract. (Id. at p. 272.) The court held that the plaintiff in Boucher was estopped from avoiding arbitration with Alliance, because his claims against Alliance relied on, made reference to, and presumed the existence of the employment agreement. (Id. at pp. 272273.)

Other California courts, applying federal law, have embraced the estoppel theory, holding that a signatory plaintiff who sues on a written contract containing an arbitration clause may be estopped from denying arbitration if he sues nonsignatories as related or affiliated persons with the signatory entity. (Turtle Ridge, supra, 140 Cal.App.4th at p. 833; Metalclad Corp. v. Ventana Environmental Organizational Partnership (2003) 109 Cal.App.4th 1705, 1713-1714, 1716-1717 (Metalclad).) As the court in Turtle Ridge explained: “ ‘[T]he equitable estoppel doctrine applies when a party has signed an agreement to arbitrate but attempts to avoid arbitration by suing nonsignatory defendants for claims that are “ ‘based on the same facts and are inherently inseparable’ ” from arbitrable claims against signatory defendants.’ ” (Turtle Ridge, supra, at p. 833, quoting Metalclad, supra, at pp. 1713-1714.) Claims that rely upon, make reference to, or are intertwined with claims under the subject contract are arbitrable. (Boucher, supra, 127 Cal.App.4th at pp. 269-270.)

Thus, a nonsignatory defendant may compel a signatory plaintiff to arbitrate under the doctrine of equitable estoppel. For the doctrine to apply, “the claims plaintiff asserts against the nonsignatory must be dependent upon, or founded in and inextricably intertwined with, the underlying contractual obligations of the agreement containing the arbitration clause.” (Goldman, supra, 173 Cal.App.4th at pp. 217-218.) “This requirement comports with, and indeed derives from, the very purposes of the doctrine: to prevent a party from using the terms or obligations of an agreement as the basis for his claims against a nonsignatory, while at the same time refusing to arbitrate with the nonsignatory under another clause of that same agreement.” (Id. at p. 221.) Application of the doctrine in a proper case is not unfair to signatory plaintiffs resisting arbitration: Not only have such plaintiffs “decided the theories on which to sue” the nonsignatory, they also have “consented to arbitrate the claims against [the signatory defendant] anyway.” (Rowe, supra, 153 Cal.App.4th at p. 1290.)

“Courts applying equitable estoppel against a signatory have ‘looked to the relationships of persons, wrongs and issues, in particular whether the claims that the nonsignatory sought to arbitrate were “ ‘ “intimately founded in and intertwined with the underlying contract obligations.” ’ ” ’ ” (Metalclad, 109 Cal.App.4th at p. 1713.) Application of “the estoppel doctrine in this context does not require a conscious or subjective intent to avoid arbitration, but turns upon the nexus between the contract and the causes of action asserted.” (Rowe, supra, 153 Cal.App.4th at p. 1289.) “The focus is on the nature of the claims asserted by the plaintiff against the nonsignatory defendant.” (Boucher, supra, 127 Cal.App.4th at p. 272.) “Claims that rely upon, make reference to, or are intertwined with claims under the subject contract are arbitrable.” (Rowe, at p. 1287.)

“Because equitable estoppel applies only if the plaintiffs’ claims against the nonsignatory are dependent upon, or inextricably bound up with, the obligations imposed by the contract plaintiff has signed with the signatory defendant, we examine the facts alleged in the complaints.” (Goldman, 173 Cal.App.4th at pp. 229230.)

Based on these authorities, it is clear that the signatory plaintiffs, Shekhter and NMS Properties, can be compelled to arbitrate all of their claims against signatory and nonsignatory defendants alike, to the extent that those claims are dependent upon, or inextricably intertwined with, the obligations imposed by the PSAs. We will turn to this latter question after we first consider whether the nonsignatory plaintiffs can also be compelled to arbitrate such claims.

4. Nonsignatory Plaintiffs May Be Required to Arbitrate Claims Arising
From Contract Containing Arbitration Clause

 

The novel question raised by this writ petition is whether the nonsignatory plaintiffs (15394 NM and NMS/JSM San Lorenzo) can also be required to arbitrate their claims which are dependent upon, or inextricably intertwined with, the obligations imposed by the PSAs. We conclude that the rationale of the authorities discussed above applies equally to nonsignatory plaintiffs who bring such causes of action.

We are concerned with the doctrine of equitable estoppel. When a plaintiff brings a claim which relies on contract terms against a defendant, the plaintiff may be equitably estopped from repudiating the arbitration clause contained in that agreement. (Boucher, supra, 127 Cal.App.4th at p. 272; Goldman, supra, 178 Cal.App.4th at p. 220.) There is no reason why this doctrine should not be equally applicable to a nonsignatory plaintiff. When that plaintiff is suing on a contract – on the basis that, even though the plaintiff was not a party to the contract, the plaintiff is nonetheless entitled to recover for its breach, the plaintiff should be equitably estopped from repudiating the contract’s arbitration clause. (Cf. Crowley Maritime Corp. v. Boston Old Colony Ins. Co. (2008) 158 Cal.App.4th 1061, 1070-1071 (Crowley) [indicating federal law applies estoppel in such circumstances when the nonsignatory received direct benefits under the contract]. See also NORCAL Mutual Ins. Co. v. Newton (2000) 84 Cal.App.4th 64, 84 [stating that no person can be permitted to adopt that part of a contract which is beneficial to him or her and simultaneously reject its burdens, including the burden to arbitrate].)

This is particularly true where, as appears to be the case here, all of the plaintiffs, signatory and nonsignatory, are related entities. A nonsignatory can be compelled to arbitrate when a preexisting relationship existed between the nonsignatory and one of the parties to the arbitration agreement, making it equitable to compel the nonsignatory to arbitrate as well. (Crowley, supra, 158 Cal.App.4th at pp. 1069-1070.) Additionally, a nonsignatory can be compelled to arbitrate when it is suing as a thirdparty beneficiary of the contract containing the arbitration clause (id. at p. 1069); this too weighs in favor of enforcing the arbitration clause in this case.

All plaintiffs in this case are apparently pursuing the cause of action for breach of the PSAs, although the legal basis on which each plaintiff is pursuing that cause of action is not entirely clear. The Modena-benefitted property plaintiffs, 15394 NM and NMS/JSM San Lorenzo, who are admittedly not signatories to the PSAs, seek to recover for breach of the Modena PSA, which required JSM Modena to transfer the Modena affordable housing property to signatory NMS Properties. Perhaps, as properties which would have been benefitted by the construction of the affordable housing on the Modena affordable housing property, the Modena-benefitted properties are proceeding on a third-party beneficiary theory. What is clear, however, is that the Modena-benefitted property plaintiffs are seeking to recover against JSM Modena for JSM Modena’s alleged breach of the Modena PSA; these plaintiffs cannot assert that they are entitled to recover according to the terms of that agreement, while simultaneously repudiating the arbitration clause contained therein.

Moreover, we believe that there is no rational basis to limit this conclusion to claims expressly based on the breach of the PSAs. The equitable estoppel doctrine extends to claims that are dependent upon or inextricably intertwined with the obligations imposed by the contract containing the arbitration clause. As with signatory plaintiffs, when nonsignatory plaintiffs are pursuing such claims, they should be bound by the arbitration clause in the contract which is integral to their claims.

Thus, resolution of the motion to compel arbitration should not involve, as plaintiffs would have it, counting up the number of nonsignatory plaintiffs and nonsignatory defendants, and denying the motion if there appear to be many of them. A nonsignatory plaintiff can be compelled to arbitrate a claim even against a nonsignatory defendant, when the claim is itself based on, or inextricably intertwined with, the contract containing the arbitration clause. We now turn to an analysis of plaintiffs’ claims.

5. The Record is Insufficient to Enable Resolution of the Motion to
Compel Arbitration

 

We are thus required to analyze the causes of action alleged in the complaint, to determine whether the claims asserted by the plaintiffs are dependent upon, or inextricably intertwined with, the obligations imposed by the PSAs. As discussed above, plaintiffs pursue four types of claims: (1) claims for breach of the PSAs; (2) claims for breach of the Deed Restriction agreements; (3) claims that defendants used the wrongfully-retained deposit amounts (from the PSAs) to develop their other projects; and (4) claims that defendants wrongfully encumbered the Tuscany and Modena properties. It is readily apparent that the first, third, and fourth category of claims are all dependent upon the PSAs. Obviously, claims for breach of the PSAs are dependent upon the PSAs. Claims for misuse of the wrongfully-retained deposits are dependent upon the PSAs; the obligation to return the deposits was imposed by the amendment to the PSAs and nothing else. Claims for wrongfully encumbering the Tuscany and Modena properties similarly are dependent upon the PSAs; any obligation not to encumber the properties was imposed solely by the PSAs, which required the properties to be sold to NMS Properties. Thus, all of these claims, whether asserted by signatory or nonsignatory plaintiffs, and whether asserted against signatory or nonsignatory defendants, are based upon the obligations created by the PSAs and therefore subject to the arbitration clauses therein.

The problem lies with the second category of claims – those for breach of the Deed Restriction agreements. Preliminarily, as stated above (see footnote 12, ante), it is difficult for this court to determine the theory of liability asserted by plaintiffs against the benefitted-property defendants for breach of the Deed Restriction agreements. While the issue of whether plaintiffs can ultimately state a claim for relief against these defendants will be for the trial court or arbitrator to determine, some clear explication of plaintiffs’ Deed Restriction-based causes of action against these defendants is necessary for court resolution of the motion to compel arbitration – as it must be determined whether the obligation purportedly breached is one inextricably intertwined with the obligations set forth in the PSAs. Moreover, given that, under the amendment to the PSAs, NMS Properties was to receive the affordable housing properties and construct the affordable housing projects there itself, we question the basis on which any plaintiffs can assert any cause of action against defendants for breaching the Deed Restriction agreements. The Deed Restriction agreements run with the land; NMS Properties would therefore be legally obligated to meet the requirements that such agreements imposed on the property owners. Plaintiffs should not be permitted to avoid an arbitration obligation by manufacturing baseless causes of action purportedly based on a contract without an arbitration clause. In short, even if defendants were initially obligated by the Deed Restriction agreements to construct the affordable housing projects on the three properties at issue, plaintiffs agreed (by amendments to contracts containing arbitration clauses) that they would take on the obligation to construct those projects. Under those circumstances, it is difficult to believe that plaintiffs can simultaneously sue defendants for breaching the Deed Restriction agreements by not constructing the projects, and harder still to believe that the issue should not be resolved by arbitration.

Beyond these substantial concerns, it is simply unclear as to whether the PSAs and the Deed Restriction agreements are inextricably intertwined. Certainly, a persuasive argument can be made that they are. The PSAs initially provided that Jones would construct “deed restricted” affordable housing projects on the properties; obtaining the Deed Restriction agreements could simply be seen as compliance with the obligations imposed by the PSAs. Even if the Deed Restriction agreements are seen as confirming the defendants’ intention to build those projects (and setting forth benefits that would be granted to other properties once the affordable housing projects were built), the initial construction obligation (and, certainly, any obligation flowing toward plaintiffs) was imposed by the PSAs.

An alternative argument also exists, at least with respect to the two Modenabenefitted property plaintiffs. These plaintiffs could conceivably assert that the Modena PSA was irrelevant. As owners of properties to be benefitted by the construction of affordable housing at Modena, by the terms of the Deed Restriction agreement, they could argue that JSM Construction’s failure to construct that affordable housing harmed them – regardless of whether Jones had also promised Shekhter in the PSA that the affordable housing project would be built and/or sold to Shekhter.

Resolution of the issue of whether the Deed Restriction agreement causes of action are inextricably intertwined with the obligations under the PSAs would be dramatically aided by evidence regarding the economic benefits to be gained by Shekhter and the remaining plaintiffs by entering into the transactions at issue. With respect to the Tuscany and Spoleto projects, Shekhter had no interest in any of the properties to be benefitted by the construction of the affordable housing projects; Shekhter was simply to own (through NMS Properties) the affordable housing projects themselves. Was Shekhter intending to operate the Tuscany and Spoleto affordable housing projects at a profit? Or did he expect to gain some economic benefit from the fact that the affordable housing projects would benefit other properties, in which he apparently had no interest? If Shekhter intended to receive an economic benefit from the fact that other properties were benefitted from the operation of the affordable housing projects he agreed to operate, this would strongly suggest that the PSAs and Deed Restriction agreements were inextricably intertwined. If, to the contrary, Shekhter simply intended to benefit from operating the affordable housing projects themselves, the Deed Restriction agreements would arguably appear to be separate and apart from the PSAs.

While the analysis is somewhat different with respect to the Modena project, as Shekhter owned two of the Modena-benefitted properties, this simply raises further questions. Did Shekhter acquire ownership of the Modena-benefitted properties before or after the Deed Restriction agreement? Did he acquire ownership before or after the PSAs? Was his acquisition of the properties an element of the consideration for agreeing to operate the Modena affordable housing project, or completely independent of it? Indeed, was it consideration for agreeing to operate all three affordable housing projects, resulting in a conclusion that the three projects were interrelated, perhaps inextricably so?

In conclusion, it is possible – perhaps even likely – that all causes of action in this case are based on, or inextricably intertwined with, the obligations imposed by the PSAs which contained the arbitration clauses. However, the record before us (and before the trial court) is insufficient to enable that determination. Thus, the trial court did not err in denying the motion to compel arbitration without prejudice. On remand, should defendants seek to renew such motion, they must support the motion with exhibits and, if necessary, declarations, demonstrating that all causes of action – particularly those based on breach of the Deed Restriction agreements – are inextricably intertwined with the obligations imposed by the PSAs.

DISPOSITION

The petition for a writ of mandate is denied. The matter is remanded for further proceedings consistent with this opinion. Each of the parties shall bear their own costs.

 

CERTIFIED FOR PUBLICATION

 

 

CROSKEY, Acting P. J.

We Concur:

 

 

KITCHING, J.

 

 

ALDRICH, J.

 The petitioners are Craig D. Jones; JSM Modena, LLC; JSM Tuscany, LLC; JSM Spoleto, LLC; JSM Lugano, LLC; JSM Genoa, LLC; JSM Roma, LLC; JSM Lucca, LLC; JSM Arrezo, LLC; JSM Positano, LLC; JSM San Marco, LLC; and JSM Construction, Inc. (collectively, petitioners). It appears that these entities are all owned and/or controlled by Jones.

 

 It appears that Shekhter owns and/or controls each of the other three plaintiff entities.

 The facts that we recite are taken primarily from the plaintiffs’ first amended complaint and the exhibits attached thereto. As discussed in greater detail below, there are substantial gaps in the documentation.

 

 The operative complaint is of no assistance in this regard, alleging only that NMS/JSM San Lorenzo is “a California limited liability company” which “is, and at all times mentioned herein, was qualified to do business and doing business in the State of California, with its principal place of business in the County of Los Angeles, City of Los Angeles, California.” The next sentence of the complaint, which was perhaps intended to explain this entity’s role in the dispute, is instead a repeat of the sentence describing the role of 15394 NM, a different plaintiff.

 

 The Administrative Approval Permit numbers are AA05-004, AA04-027, AA04018 and AA04-026. We assume the first two digits of the numbers refer to the year that the permits were issued.

 Although the record before us indicates that the other two Deed Restriction agreements at issue in this case were recorded, there is no indication in the record as to whether this Deed Restriction agreement was recorded.

 The properties are alleged to be owned by JSM Lugano, PRU/JSM Lugano, JSM Genoa and PRU/JSM Genoa. The “PRU/JSM” entities include the involvement of Prudential Investment Management, Prudential Financial Services, Inc., and/or Prudential Real Estate Investors, Inc. There are a total of nine Prudential-related entities that are named as defendants in this case. They originally brought a motion to compel arbitration which was denied; they did not seek writ review. As they are not parties to this writ proceeding (although they apparently fully support petitioners’ position), we discuss their involvement only as related to petitioners’ motion to compel arbitration.

 We do not know, for example, if any transfer from Jones to Shekhter of two of the Modena-benefitted properties was part of the overall transaction which was intended to transfer the Modena affordable housing property to Shekhter. Nor do we know if any transfer of the Modena-benefitted properties made reference to an obligation to construct the affordable housing at Modena. Moreover, as referenced above, the San Lorenzo entity which owns one of the Modena-benefitted properties has a name, “NMS/JSM San Lorenzo,” which suggests, at least, that Jones may have had an interest in the entity at one time.

 Plaintiffs’ complaint does not identify an owner of the 1442 Fifth Street property.

 We note here that the Deed Restriction agreement was entered into after the parties had agreed that it would be NMS Properties, not JSM Construction, that would construct the affordable housing project at 1437 Fifth.

 

 The copy of the Spoleto Deed Restriction agreement provided to this court in petitioners’ exhibits in support of their petition is cut off after the eighth page; the other two Deed Restriction agreements are 23 pages in length.

 Try as we might, this court cannot determine on what basis plaintiffs could possibly recover against the benefitted-property defendants for breach of the Deed Restriction agreements. By the language of the Deed Restriction agreements themselves, these defendants were, at best, third-party beneficiaries of the Deed Restriction agreements, and owed no duties under the agreements to anyone. Plaintiffs, who were to have been the eventual owners of the affordable housing projects which would have benefitted the benefitted-property defendants, and (with respect to the Modena Deed Restriction agreement) were two other third-party beneficiaries of the Deed Restriction agreements, do not clearly explain the basis on which they can recover against third-party beneficiaries for breach of the Deed Restriction agreements. In the operative complaint, plaintiffs variously allege that these defendants “received a favorable deed restriction”; breached the Deed Restriction agreements “by failing to construct the properties as required”; were developed (if developed) “at the benefit and to the detriment of” the related affordable-housing projects; and “received market rate housing units, without an affordable component.” While plaintiffs’ allegations are not clear as to whether the benefitted properties were, in fact, developed (as the benefitted-property defendants are apparently sued both for failing to develop and for developing their properties), we fail to see how a third-party beneficiary of a contract can be liable for breaching that contract simply by receiving (or not receiving) the benefits to which it was entitled under the contract.

 

 Apparently, the defendants not only sought to compel arbitration, but also filed a demurrer to the first amended complaint, which was sustained with leave to amend. The plaintiffs filed their second amended complaint on September 13, 2010. That pleading, however, is not before us and is not relevant to the issues presented by the pending petition for a writ of mandate.

 

 In their opposition to the writ petition, plaintiffs argue, for the first time, that their cause of action seeking injunctive relief under Business and Professions Code section 17200 cannot be subject to arbitration. As this argument was never raised before the trial court, we decline to address it.

 The PSAs were standard form contracts, with the bulk of the preprinted provisions stricken and a separately-drafted addendum attached. The arbitration clause was contained in the separately-drafted addendum. There is no suggestion that the clause was not intentionally agreed-upon by the parties.

 Code of Civil Procedure, section 1281.2, provides, in relevant part as follows: “On petition of a party to an arbitration agreement alleging the existence of a written agreement to arbitrate a controversy and that a party thereto refuses to arbitrate such controversy, the court shall order the petitioner and the respondent to arbitrate the controversy if it determines that an agreement to arbitrate the controversy exists, unless it determines that: [¶] . . . [¶] (c) A party to the arbitration agreement is also a party to a pending court action or special proceeding with a third party, arising out of the same transaction or series of related transactions and there is a possibility of conflicting rulings on a common issue of law or fact. . . .  [¶] If the court determines that a written agreement to arbitrate a controversy exists, an order to arbitrate such controversy may not be refused on the ground that the petitioner’s contentions lack substantive merit. [¶] If the court determines that there are other issues between the petitioner and the respondent which are not subject to arbitration and which are the subject of a pending action or special proceeding between the petitioner and the respondent and that a determination of such issues may make the arbitration unnecessary, the court may delay its order to arbitrate until the determination of such other issues or until such earlier time as the court specifies. [¶] If the court determines that a party to the arbitration is also a party to litigation in a pending court action or special proceeding with a third party as set forth under subdivision (c) herein, the court (1) may refuse to enforce the arbitration agreement and may order intervention or joinder of all parties in a single action or special proceeding; (2) may order intervention or joinder as to all or only certain issues; (3) may order arbitration among the parties who have agreed to arbitration and stay the pending court action or special proceeding pending the outcome of the arbitration proceeding; or (4) may stay arbitration pending the outcome of the court action or special proceeding.”

 Moreover, we note that there are substantial issues of urgency when the case involves the development of property. In an environmental case involving issues under the California Environmental Quality Act (CEQA), the court noted that in such cases, “time is money. A project opponent can ‘win’ even though it ‘loses’ in an eventual appeal because the sheer extra time required for the unnecessary appeal (with the risk of higher interest rates and other expenses) makes the project less commercially desirable, perhaps even to the point where a developer will abandon it or drastically scale it down.” (County of Orange v. Superior Court (2003) 113 Cal.App.4th 1, 6.) We have an analogous concern here.

 Where the equitable estoppel doctrine applies, the nonsignatory has a right to enforce the arbitration agreement. (Rowe, supra, 153 Cal.App.4th at p. 1290.) In such cases, the nonsignatory is not a “third party” within the meaning of section 1281.2, subdivision (c), and that provision simply does not apply. (Laswell v. AG Seal Beach, LLC (2010) 189 Cal.App.4th 1399, 1407-1408.)

 Shekhter asserts that, as he assigned his rights under the PSAs to NMS Properties, he is no longer a signatory to those agreements. However, plaintiffs’ complaint makes no effort to exclude Shekhter from the plaintiffs suing on the PSAs, and, at one point, appears to allege a breach of the initial PSAs, rather than the amended PSAs. (Plaintiffs allege Jones, JSM Modena, JSM Tuscany and JSM Spoleto breached the PSA by failing to develop the affordable housing projects – an obligation required by the initial PSAs, but not the amended ones.) As Shekhter is suing on the PSAs, and appears to, at least in part, assert breach of the initial PSAs to which he was a party, we conclude that he is necessarily a signatory.

 In our analysis, we place the greatest emphasis on the theory of (1) equitable estoppel of a plaintiff suing on a contract rather than the (2) binding of entities that are in some way related to a signatory party or are third-party beneficiaries of the contract, although we note that the two approaches are ultimately nearly identical. This is so because it is difficult to conceive of a situation in which a nonsignatory party can state a valid claim based on the contract, without having some legal relationship with a signatory to the contract or being a third-party beneficiary of the contract.

Thus, for example, in County of Contra Costa v. Kaiser Foundation Health Plan, Inc. (1996) 47 Cal.App.4th 237, the court considered the situation in which a plaintiff, who had been hit by a car, sued her health insurer for medical malpractice as well as other defendants allegedly liable for the accident. The codefendants brought claims for equitable indemnity against the insurer, who moved to compel arbitration of the plaintiff’s action and the co-defendants’ crossactions. While the plaintiff’s action against the insurer was clearly arbitrable, as the insurance contract contained an arbitration clause, the codefendants’ cross-actions were not. The court concluded that the co-defendants could not be compelled to arbitrate because there was no preexisting relationship between the co-defendants and the insured plaintiff which would have enabled the insured plaintiff to bind them when she agreed to the arbitration clause. (Id. at p. 243.) Yet, the same result could have been reached on the theory that the codefendants’ cross-actions against the health insurer were not based on the contract between the insurer and the plaintiff.

Consider also the language in Crowley Maritime Corp. v. Boston Old Colony Ins. Co., supra, 158 Cal.App.4th 1061, in which defendant insurers, faced with an equitable contribution claim from a plaintiff insurer which had indemnified the common insured, sought to compel arbitration on the basis of arbitration clauses in defendant insurers’ insurance policies. The appellate court concluded arbitration could not be compelled, because a cause of action for equitable contribution is not based on the insurance policies, but arises in equity. (Id. at p. 1064.) The court rejected the defendant insurers’ argument that they were simply trying to “ ‘stand in the shoes’ ” of the insured, noting that a “common theme in [those] cases is that the party seeking relief was suing on the contract itself, not a statute or some other basis outside the contract.” (Id. at p. 1071.) In contrast, however, when a nonsignatory to a contract is attempting to seek relief for breach of the contract itself, that nonsignatory must be doing so by means of either a third-party beneficiary argument, or a legal theory which entitles that nonsignatory to “stand in the shoes” of a party to the agreement – either by virtue of a preexisting relationship, or as an assignee or successor in interest.

 This is particularly true with respect to the Spoleto Deed Restriction agreement, which was not even executed until after the Spoleto PSA had been amended, providing that it would be NMS Properties that would develop the Spoleto affordable housing project.

 Was there, for example, a contemplated agreement whereby Shekhter would be compensated by the benefitted properties for his continued operation of the affordable housing projects which enable the benefitted properties to continue to operate as market-rate rentals?

 The Modena and Tuscany PSAs, at least, were simultaneously executed, as were the amendments to all three PSAs.

 

 A renewed motion would, obviously, be directed to the newly-filed second amended complaint. At the hearing on the motion to compel arbitration, defendants suggested that they might renew their motion if they succeeded on demurrer with respect to some causes of action. Given our concerns regarding the breach of Deed Restriction agreement causes of action as alleged in the first amended complaint, such a demurrer may be appropriate.

 The issue of third parties must also be addressed. It appears from the first amended complaint that the Prudential defendants would have arguments similar, if not identical, to those of the petitioners here. The Trust Deed Defendants, however, are not similarly situated. Should the trial court determine that petitioners are otherwise entitled to arbitration, the trial court should consider whether to stay the action against the Trust Deed Defendants pending completion of the arbitration pursuant to Code of Civil Procedure section 1281.2, subdivision (c). (Laswell v. AG Seal Beach, LLC, supra, 189 Cal.App.4th at p. 1405.)

 

Advertisements

By Steven G. Mehta

A new case , Wherry v. Award Inc., recently came down on arbitration clauses. An arbitration clause was found to be procedurally unconscionable where plaintiffs were given the agreement when at the beginning of the relationship with defendants; were told they were required to sign it if they wanted to work for defendants and were only given a few minutes to review and sign the agreement.  The plaintiffs were also not given an opportunity to ask questions; nor were they given a copy of the document.  Further, the clause authorizing the arbitrator to award costs, including the arbitration fee, on the losing party, was substantively unconscionable.

The full copy of the decision is set forth below.

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

 

FOURTH APPELLATE DISTRICT

 

DIVISION THREE

 

 

KARENA WHERRY et al.,

 

Plaintiffs and Respondents,

 

v.

 

AWARD, INC., et al.,

 

Defendants and Appellants.

 

 

G042404

 

(Super. Ct. No. 30-2008-00108123)

 

O P I N I O N

 

Appeal from an order of the Superior Court of Orange County, Kirk H. Nakamura, Judge.  Affirmed

Law Office of Michael A. Conger, Michael A. Conger; and Richard H. Benes for Defendants and Appellants Award, Inc., Award-Superstars and Century 21 Superstars.

Duckor Spradling Metzger & Wynne, John C. Wynne and Rose M. Huelskamp for Defendant and Appellant Gregory Britton.

Law Offices of Jason L. Oliver, Jason L. Oliver; Law Offices of John W. Dalton and John W. Dalton for Plaintiffs and Respondents.

 

Defendants Award, Inc., Award-Superstars, Century 21 Superstars and Gregory Britton appeal from an order denying their petition to arbitrate the complaint for gender discrimination and sexual harassment filed by plaintiffs Karena Wherry and Rocelyn Traieh.  Defendants assert the petition should have been granted for a variety of reasons, including that in the contract executed by the parties they agreed to arbitrate all disputes, including those under FEHA (California Fair Employment and Housing Act; Gov. Code, § 12900 et seq.), and the terms of arbitration were not unconscionable.  We determine the arbitration provisions were unconscionable and therefore unenforceable and affirm.

 

FACTS AND PROCEDURAL HISTORY

 

In mid-2006 each plaintiff entered into an Independent Contractor Agreement (agreement) with defendant Award, Inc. to act as a salesperson; defendant Britton signed the contracts as the office manager.  Both agreements contain an arbitration provision, which states, “All disputes or claims between [plaintiff] and other licensee(s) associated with [defendant], or between [plaintiff] and [defendant] arising from or connected in any way with this [a]greement, which cannot be adjusted between the parties involved, shall be submitted to the Association of REALTORS®

(CAR) . . . pursuant to the provisions of its Bylaws, as may be amended from time to time, which are incorporated as part of this [a]greement by reference.  If the Bylaws of the Association do not cover arbitration of the dispute, or if the Association declines jurisdiction over the dispute, then arbitration shall be pursuant to the rules of California law.  The Federal Arbitration Act . . . shall govern this [a]greement.”

The relationships between plaintiffs and defendants were terminated in the spring and summer of 2007.  After plaintiffs filed a complaint for gender discrimination, sexual harassment, and retaliation, defendants filed a petition to compel arbitration, which the court granted.  Plaintiffs petitioned our court for a writ of mandate seeking to reverse the grant of the arbitration petition.  Subsequently we issued an alternative writ of mandate ordering the superior court to vacate its order compelling arbitration and enter a new order denying the motion or show cause in this court.  The trial court vacated its order and denied the motion without any explanation.   Additional facts are set out in the discussion.

 

DISCUSSION

 

1.  Introduction

Unconscionable arbitration agreements are not enforceable.  (Armendariz v. Foundation Health Psychcare Services, Inc. (2000) 24 Cal.4th 83, 114-121 (Armendariz).) To be voided on this ground, the agreement must be both procedurally and substantively unconscionable.  (Ibid.)  “‘[T]he former focus[es] on “‘oppression’” or “‘surprise’” due to unequal bargaining power, the latter on “‘overly harsh’” or “‘one-sided’” results.’  [Citation.]”  (Little v. Auto Stiegler, Inc. (2003) 29 Cal.4th 1064, 1071.)  But the two elements need not exist to the same degree.  The more one is present, the less the other is required.  (Armendariz, supra, 24 Cal.4th at p. 114.)

“The procedural element of an unconscionable contract generally takes the form of a contract of adhesion, “‘which, imposed and drafted by the party of superior bargaining strength, relegates to the subscribing party only the opportunity to adhere to the contract or reject it.”’  [Citation.]”  (Little v. Auto Stiegler, Inc., supra, 29 Cal.4th at p. 1071.)  “Substantively unconscionable terms may take various forms, but may generally be described as unfairly one-sided.”  (Id. at pp. 1071-1072.)  In the case before us both elements were present.

 

2.  Procedural Unconscionability

Procedural unconscionability may be proven by showing oppression, which is present when a party has no meaningful opportunity to negotiate terms or the contract is presented to them on a take it or leave it basis.  (Lhotka v. Geographic Expeditions, Inc. (2010) 181 Cal.App.4th 816, 821; Szetela v. Discover Bank (2002) 97 Cal.App.4th 1094, 1100.)

The record reveals that is what occurred here.  Both plaintiffs filed declarations stating that they were given the agreement when they first contracted with defendants and were told they were required to sign it if they wanted to work for defendants.  No one described the agreement’s contents and plaintiffs were given but a few minutes to review and sign it, without any time to ask questions.  Further they were never given a copy of the document.

Defendants provided no evidence to the contrary.  That plaintiffs initialed every page and signed the document does not vitiate plaintiffs’ lack of time to review the agreement or have a lawyer look at it.  This is similar to Ontiveros v. DHL Exp. (USA), Inc. (2008) 164 Cal.App.4th 494, where, in a FEHA action, the court held an arbitration provision in an employment contract was procedurally unconscionable because the employee did not know she had agreed to arbitrate, the agreement was buried in a stack of other documents, the employee had no time to review it, and no one explained it to her.  (Id. at p. 508.)  Defendants attempt to discount this evidence by claiming plaintiffs were “sophisticated.”  But again, they point to no evidence.

Defendants also dispute that it was a take it or leave it agreement, claiming there were “numerous material terms” “not pre[]printed[] and either handwritten or typed by the parties.”  A review of the record does not bear this out.  Each agreement was a preprinted form titled “Independent Contract Agreement” (capitalization omitted) provided by the CAR that did contain some blanks.  But the spaces to be filled in generally were not material:  the date of the agreement, the name of the agent, the realty associations of which the broker was a member, the multiple listing services to which it subscribed, the address of the office, the amount of auto insurance plaintiffs were required to carry, and signature blocks.

One additional blank was an indemnity and hold harmless provision, which referred to one of three exhibits attached to the agreements.  These exhibits also appear to be preprinted although they do not bear the CAR name.  In addition to indemnity the exhibits deal with compensation.  Besides the signature lines, the only handwritten portions filled in blanks stating the beginning commission rate and an anniversary date.  While compensation is material, there is no evidence that term or any other was negotiated, and in fact plaintiffs’ declarations at least imply if they do not actually state the information was filled in before the agreements were presented to them.  In sum, nothing in the record supports defendants’ argument the agreements were negotiated rather than presented as take it or leave it.

Further, contrary to defendants’ claim, the fact there were other real estate firms where plaintiffs could have contracted to work does not necessarily vitiate the unconscionability, especially given the fact that as a CAR form, it is highly likely most if not all other brokerage firms would be using it.  (Szetala v. Discover Bank, supra, 97 Cal.App.4th at p. 1100; Gatton v. T-Mobile USA, Inc. (2007) 152 Cal.App.4th 571, 583.)  It merely means additional procedural unconscionability or a greater degree of substantive unconscionability must be shown.  (Gatton v. T-Mobile USA, Inc., supra, 152 Cal.App.4th at pp. 583-584.)  “[T]he more substantively oppressive the contract term, the less evidence of procedural unconscionability is required . . . and vice versa.”  (Armendariz, supra, 24 Cal.4th at p. 114.)

 

3.  Substantive Unconscionability

“Substantive unconscionability addresses the fairness of the term in dispute.  It ‘traditionally involves contract terms that are so one-sided as to “shock the conscience,” or that impose harsh or oppressive terms.’  [Citation.]”  (Szetela v. Discover Bank, supra, 97 Cal.App.4th at p. 1100.)  Plaintiffs claim there are several provisions that are substantively unconscionable, including that there is no provision for discovery, plaintiffs are subject to fees and costs prohibited by FEHA, and the limitations period is less than what is allowed by statute.

In Armendariz, supra, 24 Cal.4th 83, the court held that a mandatory “arbitration agreement cannot be made to serve as a vehicle for the waiver of statutory rights created by the FEHA.”  (Id. at pp. 101, 103, fn. 8.)  To be valid, at minimum the arbitration agreement must require a neutral arbitrator, sufficient discovery, and a written decision adequate enough to allow judicial review.  Further, it must include all remedies available in a judicial action and the employee may not be required to pay unreasonable costs or fees.  (Id. at p. 102.)  Elimination of or interference with any of these basis provisions makes an arbitration agreement substantively unconscionable.

The terms of the arbitration manual violate Armendariz.  That case directs, among other things, that where employment is conditioned on mandatory arbitration, the employer cannot impose on the employee costs he or she would not normally have to pay if the case were litigated in a court.  (Armendariz, supra, 24 Cal.4th at pp. 110-111.)  Thus, an employee will not be prevented from filing a FEHA suit because of extraordinary costs of litigation.  (Ibid.)  Here the manual does just that by providing the arbitrator may impose costs, including the arbitration fee, on the losing party.

Defendants argue that the arbitration manual does not require plaintiffs to pay costs.  Nevertheless it empowers the arbitrator to impose them, in violation of Armendariz.  Defendants maintain that the arbitration panel “is able to award costs and attorney[] fees consistent with . . . Armendariz.”  But again, nowhere in the agreements or the arbitration manual is that protection provided.

In a similar vein defendants assert this is not a ground on which to invalidate arbitration because Armendariz held that a “mandatory employment arbitration agreement that contains within its scope the arbitration of FEHA claims impliedly obliges the employer to pay all types of costs that are unique to arbitration.”  (Armendariz, supra, 24 Cal.4th at p. 113.)  So it did but in that case there was no provision at all as to who would bear the costs, contrary to the terms here that expose plaintiffs to the risk of paying costs.  That plaintiffs are independent contractors and not employees makes no difference in this context.  The contract by which they were to work for defendants contained a mandatory arbitration provision.

In an FEHA case, unless it would be unjust, a prevailing plaintiff should recover attorney fees, but a prevailing defendant is awarded fees only if the case was frivolous or filed in bad faith.  (Chavez v. City of Los Angeles (2010) 47 Cal.4th 970, 985.)  Here, the agreements provide that the prevailing party is entitled to attorney fees, without any limitation for a frivolous action or one brought in bad faith.  This violates Armendariz.  (Trivedi v. Curexo Technology Corp. (2010) 189 Cal.App.4th 387, 394-395.)  Defendants argue this merely means the arbitrator has the authority to impose attorney fees in line with FEHA.  But nothing in the agreement or the arbitration manual supports this claim.  Moreover, the arbitration manual explicitly states that if the agreement provides for an award of attorney fees, they may be included as part of the award.

In addition, the arbitration manual provides an arbitration must be filed within 180 days of the event triggering the action.  This is far shorter than the minimum one-year statute for FEHA claims.  (Gov. Code, § 12960, subd. (d); see Nyulassy v. Lockheed Martin Corp. (2004) 120 Cal.App.4th 1267, 1283 [180-day statute of limitations period one factor supporting finding of substantive unconscionability].)  Defendants claim that because plaintiffs filed their complaint within 180 days of receiving their right to sue notices, this issue is irrelevant.  But protections under FEHA are for the benefit of the entire public, not just these plaintiffs.  Thus, a mandatory arbitration provision required as part of an employment relationship cannot waive the statutory rights.  (Armendariz, supra, 24 Cal.4th at pp. 100-101.)

As a backup argument, defendants assert that if the terms of the arbitration manual are unconscionable, the court can somehow disregard them and rely on statutory rules of arbitration (Code Civ. Proc., § 1280 et seq.) based on the agreement’s provision that if CAR declines to arbitrate the case or its CAR’s bylaws “do not cover arbitration of the dispute,” California law will be used.  This does not persuade.

First, there is no evidence the bylaws “do not cover” the claims in the complaint.  Rather, some of the rules covering it are unconscionable.  Second, the language of the provision does not lend itself to an interpretation that it is a fallback in the event defendants’ arbitration rules are found unconscionable.  Third, Code of Civil Procedure section 1280 et seq. does not deal with all of the requirements under Armendariz necessary to enforce an arbitration agreement covering a FEHA dispute.

We also reject defendants’ claim plaintiffs had to prove the CAR would not agree to arbitrate the dispute.  Whether the CAR decided to arbitrate was completely within its discretion; the provision was entirely one-sided.  According to the terms of the agreement, plaintiffs had no power to control this.

In sum, the arbitration agreement was procedurally and substantively unconscionable, leading to the inevitable conclusion it is unenforceable.

 

4.  Severance

Relying on Civil Code section 1670.5, subdivision (a) defendants argue we may simply sever the unconscionable provisions and enforce the remainder of the agreement.  That section does give the court the discretion to do so but it also authorizes the court to reject the entire agreement.  In determining whether to sever, the court must consider the interests of justice.  (Armendariz, supra, 24 Cal.4th at p. 124.)  “[M]ultiple defects [in an agreement] indicate a systematic effort to impose arbitration on [a weaker party] . . . as an inferior forum that works to [the stronger party’s] advantage.”  (Ibid.)  Here, based on the several unconscionable provisions detailed above “the arbitration agreement is so ‘“permeated” by unconscionability [it] could only be saved, if at all, by a reformation beyond our authority.’  [Citations.]”  (Martinez v. Master Protection Corp. (2004) 118 Cal.App.4th 107, 119.)

We agree with defendants that the general rule does favor arbitration and terms should be interpreted liberally (Gravillis v. Coldwell Banker Residential Brokerage Co. (2006) 143 Cal.App.4th 761, 771), but when the agreement is rife with unconscionability as here, the overriding policy requires that the arbitration be rejected (Armendariz, supra, 24 Cal.4th at p. 1278).

 

DISPOSITION

 

The order is affirmed.  Respondents are entitled to costs on appeal.

 

 

 

 

 

RYLAARSDAM, ACTING P. J.

 

WE CONCUR:

 

 

 

ARONSON, J.

 

 

 

IKOLA, J.

 

 

Filed 2/23/11

 

 

 

CERTIFIED FOR PUBLICATION

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

 

FOURTH APPELLATE DISTRICT

 

DIVISION THREE

 

KAREN WHERRY et al,

 

Plaintiffs and Respondents,

 

v.

 

AWARD, INC., et al.,

 

Defendants and Appellants.

 

 

G042404

 

(Super. Ct. No. 30-2008-00108123)

 

ORDER CERTIFYING OPINION

FOR PUBLICATION

Respondents and McGuinn, Hillsman & Palefsky, counsel for California Employment Lawyers Association, each requested that our opinion filed on February 9, 2011, be certified for publication.  It appears that our opinion meets the standards set
forth in California Rules of Court, rule 8.1105(c).  The request is GRANTED.  The opinion is ordered published in the Official Reports.

 

 

 

 

RYLAARSDAM, ACTING P. J.

 

WE CONCUR:

 

 

 

ARONSON, J.

 

 

 

IKOLA, J.

 

 

By Steven G. Mehta

In the span of one week, the court of appeal has issued two rulings on the issue of arbitration.  The most recent was in the case of Abaya v. Spanish Ranch denied a motion to compel arbitration on the grounds of possible conflicting rulings.  In Abaya, the court ruled that the trial court did not abuse its discretion in denying defendants’ motion to compel arbitration where multiple plaintiffs had sued defendants.  Only a few of the plaintiffs had signed an arbitration agreement.   The court ruled that given the risk of conflicting rulings on common issues of law or fact between those claims submitted to arbitration and those that remained in the civil court for resolution, the trial court was correct to deny the motion to compel arbitration.

the complete text of the decision is as follows:

Numerous residents of a mobile home park sued the current and former owners of the facility where they live alleging substandard conditions.  Defendants moved to compel arbitration or, in the alternative, judicial reference under an alternative dispute resolution (ADR) provision contained in the leases of many, but not all, residents.  In separate orders, the court denied arbitration and judicial reference.  The denial was based on several grounds.  Pertinent here, the court found that enforcement of the ADR provision risked conflicting rulings on common issues of law and fact by sending the claims of some residents to arbitration or reference, while others remained in the civil court for resolution.

Defendants challenged the denial of judicial reference in petitions for writs of mandate, and challenged the denial of arbitration in this appeal.  The petitions for writs of mandate reached us first, and presented the question of whether a trial court has discretion to deny a motion under Code of Civil Procedure section 638 to refer a dispute to a referee under a pre-dispute agreement of the parties where there is the possibility of conflicting rulings on a common issue of law or fact.  We answered in the affirmative, and our determination of that issue is now under review.  (Tarrant Bell Property, LLC v. Superior Court (2009) 179 Cal.App.4th 1283, review granted Feb. 18, 2010, S179378.)  Having concluded that a trial court does have discretion to deny judicial reference in an appropriate case, we also evaluated the facts presented in the parties’ dispute and concluded that the court did not abuse its discretion in refusing to refer the parties’ dispute to a referee.  (Ibid.)

We are now presented with a related issue.  Unlike the dispute over the scope of a trial court’s power to deny judicial reference, the parties are agreed that the trial court is vested with discretion to deny arbitration where there is the possibility of conflicting rulings on a common issue of law or fact.  (Code Civ. Proc., § 1281.2, subd. (c).)  But defendants argue that the court erred in finding a possibility of conflicting rulings.  We conclude, as we did on the issue of judicial reference, that the court did not err in finding the possibility of conflicting rulings.  We affirm the court’s order denying defendants’ motion to compel arbitration.

I.  facts[1]

Spanish Ranch I Mobile Home Park (the Park) is a 50-acre Hayward facility with 462 sites or spaces.  In October 2008, 120 current and former residents of the Park sued the Park owners upon allegations that the owners failed to properly maintain the common areas and facilities within the Park.  Defendant Monterey Coast, L.P. is the current owner, and defendants Tarrant Bell Property, LLC and Spanish Ranch I, L.P. are former owners.

In December 2008, defendants moved to compel arbitration or, in the alternative, judicial reference.  (Code Civ. Proc., §§ 638, 1281.2.)  Many of the plaintiffs had signed Park leases containing an ADR provision.  The parties dispute the exact number of plaintiffs subject to an ADR lease provision.  Defendants put the number at 99 or 100 while plaintiffs say 89.[2] The exact number is not important here.  It is sufficient to note that many, but not all, of the plaintiffs agreed to submit tenant disputes to ADR.

There were several standard form leases used over the years at the Park, with slight variation in the ADR provisions, but those differences are not material to this appeal.  In substance, the leases state that it is agreed that any tenancy dispute (with major exceptions for actions by the Park owner) shall be submitted to arbitration conducted under the provisions of Code of Civil Procedure section 1280 et seq.  “ ‘Dispute’ ” is defined to include claims regarding “maintenance, condition, nature, or extent of the facilities, improvements, services, and utilities provided to the space, park, or common areas of the park.”[3] The leases further state:  “If these arbitration[] provisions are held unenforceable for any reason it is agreed that all arbitrable issues in any judicial proceeding will be subject to and referred on motion by any party or the court for hearing and decision by a referee (a retired judge or other person appointed by the court) as provided by California law, including Code of Civil Procedure section 638, et seq.”  (Underlining omitted.)  Costs for the arbitration or reference “shall be advanced equally” between the tenant and Park owner.

Plaintiffs opposed the motion to compel arbitration or reference on a number of grounds.  Plaintiffs argued that the ADR provision is unenforceable as an invalid waiver of rights protected under the Mobilehome Residency Law and landlord-tenant law.  (Civ. Code, §§ 798.77, 798.87, subd. (a), 1953, subd. (a).)  Plaintiffs also asserted that the ADR provision is unconscionable because it exploits the weak bargaining position of mobile home residents and requires ADR of the residents’ disputes while exempting unlawful detainer and other Park owner actions from ADR.  Finally, plaintiffs urged the court to refuse enforcement of the ADR provision because its enforcement risked conflicting rulings on common issues of law and fact by sending the claims of some Park residents to arbitration or reference while others remained in the civil court for resolution.

In March 2009, the court denied defendants’ motion to compel arbitration on two grounds:  (1) the Mobilehome Residency Law precludes waiver of a resident’s right to bring a civil action for a park’s improper maintenance of the common facilities (Civ. Code, §§ 798.77, 798.87, subd. (a)); and (2) there is the risk of inconsistent rulings on common issues (Code Civ. Proc., § 1281.2, subd. (c)).  It will be recalled that the lease provided alternative forms of ADR:  arbitration preferentially, but reference if the “arbitration[] provisions are held unenforceable for any reason.”  The court, having held the arbitration provisions unenforceable, was asked by defendants to compel reference.

The court received supplemental briefing on defendants’ alternative request for reference and, in May 2009, denied that request as well.  The court found that sending some of the plaintiffs to a referee while others remained in the superior court risked inconsistent rulings.  The court also found that splitting the action would defeat the purposes of the reference statute by duplicating efforts and increasing costs.

Defendants appealed the trial court’s March 2009 order denying their motion to compel arbitration, and that appeal is now before us.  (Code Civ. Proc., § 1294, subd. (a).)  Defendants also filed petitions for a writ of mandate to vacate the court’s May 2009 order denying their alternative motion to compel reference.  As noted above, the writ petitions reached us first, and presented the question of whether a trial court has discretion to deny a motion under Code of Civil Procedure section 638 to refer a dispute to a referee under a pre-dispute agreement of the parties.  We answered in the affirmative, and found no abuse of discretion in the court’s refusal to refer the parties’ dispute to a referee given the possibility of conflicting rulings on a common issue of law or fact.  (Tarrant Bell Property, LLC v. Superior Court (2009) 179 Cal.App.4th 1283, review granted Feb. 18, 2010, S179378.)

We now confront a related issue in this appeal of the order denying arbitration.  Unlike the dispute over the scope of a trial court’s power to deny judicial reference, the parties are agreed that the trial court is vested with discretion to deny arbitration where there is the possibility of conflicting rulings on a common issue of law or fact.  (Code Civ. Proc., § 1281.2, subd. (c).)  But defendants claim that the court erred in finding a possibility of conflicting rulings.  We turn to a discussion of that claim.

Ii.  discussion

As noted above, many of the plaintiff Park residents agreed to submit tenant disputes to arbitration but some did not.  The court concluded that sending the claims of some residents to arbitration, while others remained in the civil court for resolution, risked inconsistent rulings on common issues (such as liability).  We review an order denying arbitration pursuant to Code of Civil Procedure section 1281.2, subdivision (c) for an abuse of discretion.[4] (Mercury Ins. Group v. Superior Court (1998) 19 Cal.4th 332, 340; Best Interiors, Inc. v. Millie & Severson, Inc. (2008) 161 Cal.App.4th 1320, 1329; Fitzhugh v. Granada Healthcare & Rehabilitation Center, LLC (2007) 150 Cal.App.4th 469, 475; Henry v. Alcove Investment, Inc. (1991) 233 Cal.App.3d 94, 101.)  Under this deferential standard of review, “the trial court’s order will not be disturbed on appeal unless it exceeds the bounds of reason.”  (Henry, supra, at p. 101.)  No abuse of discretion appears on this record.[5]

A.         The arbitration statute

Section 1281.2 provides in relevant part:  “On petition of a party to an arbitration agreement alleging the existence of a written agreement to arbitrate a controversy and that a party thereto refuses to arbitrate such controversy, the court shall order the petitioner and the respondent to arbitrate the controversy if it determines that an agreement to arbitrate the controversy exists, unless it determines that:  [¶] . . . [¶] (c) A party to the arbitration agreement is also a party to a pending court action or special proceeding with a third party, arising out of the same transaction or series of transactions and there is a possibility of conflicting rulings on a common issue of law or fact.”

“If the court determines that a party to the arbitration is also a party to litigation in a pending court action or special proceeding with a third party as set forth under subdivision (c) herein, the court (1) may refuse to enforce the arbitration agreement and may order intervention or joinder of all parties in a single action or special proceeding; (2) may order intervention or joinder as to all or only certain issues; (3) may order arbitration among the parties who have agreed to arbitration and stay the pending court action or special proceeding pending the outcome of the arbitration proceeding; or (4) may stay arbitration pending the outcome of the court action or special proceeding.”  (§ 1281.2.)

B.         A trial court may refuse to compel arbitration where a controversy affects claims by other parties not bound by the arbitration agreement and arbitration risks conflicting rulings on common issues of law or fact

“While there is a strong public policy in favor of arbitration, there is an ‘equally compelling argument that the Legislature has also authorized trial courts to refuse enforcement of an arbitration agreement [or to stay the arbitration] when, as here, there is a possibility of conflicting rulings.’ ”  (Fitzhugh v. Granada Healthcare & Rehabilitation Center, LLC, supra, 150 Cal.App.4th at p. 475.)  The California Supreme Court has explained that “ ‘[s]ection 1281.2(c) is not a provision designed to limit the rights of parties who choose to arbitrate or otherwise to discourage the use of arbitration.  Rather, it is part of California’s statutory scheme designed to enforce the parties’ arbitration agreements . . . .  Section 1281.2(c) addresses the peculiar situation that arises when a controversy also affects claims by or against other parties not bound by the arbitration agreement.  The California provision giving the court discretion not to enforce the arbitration agreement under such circumstances—in order to avoid potential inconsistency in outcome as well as duplication of effort—’ ” is consistent with the policy of encouraging arbitration.  (Cronus Investments, Inc. v. Concierge Services (2005) 35 Cal.4th 376, 393.)

The legislative history of section 1281.2 defines the problem the Legislature intended to address:  “In actions involving multiple parties with related claims, where some claimants agree to arbitrate their differences and others remain outside the agreement, arbitration is unworkable.  Where a party to an arbitration agreement is also party to a pending court action or special proceeding, with such a third party, there may be a possibility of conflicting rulings on issues of law or fact.”  (Sen. Com. on Judiciary, Analysis of Sen. Bill No. 1628 (1997-1998 Reg. Sess.) p. 2, italics added.)

C.        The trial court properly denied defendants’ motion to compel arbitration because sending the claims of some plaintiff residents to arbitration while others remained in the civil court for resolution risked conflicting rulings on common issues of law or fact

The trial court here properly concluded that the action involved common issues of law and fact.  Defendant Park owners were parties to arbitration agreements with 89 to 100 residents that covered claims relating to defendants’ alleged failure to maintain the Park’s common facilities, as well as parties to a lawsuit by 20 to 31 residents that alleged the same claims.  All plaintiff residents alleged that various common facilities at the Park were inadequately maintained, in violation of statutory provisions and the common law.  In support of their multiple legal theories for nuisance, breach of the warranty of habitability and related claims, plaintiffs alleged in their complaint that defendants failed to “maintain the Park’s common areas, facilities, services, and physical improvements in good working order and condition,” including the sewer system, water system, drainage system, electrical system, and street system, and that they refused to fix these problems.  Whether the common areas, facilities, services and improvements were adequately maintained, and whether any maintenance deficiencies violated any of the alleged statutory or common law rights of plaintiffs, presented common questions of law and fact.  Plaintiffs’ requested declaratory and injunctive relief likewise presented common questions.  Resolution of those common questions in different forums presented the possibility of inconsistent rulings on those issues.  For example, in an arbitration the arbitrator might determine that defendants did not fail to maintain the common facilities and deny relief to the plaintiffs, while a trial court might reach a contrary finding and permit recovery by those plaintiffs not subject to an arbitration agreement.  Because plaintiffs in court might recover for their alleged injuries based on the same conditions of the Park for which arbitrating plaintiffs might be denied relief—or vice versa—the possibility of conflicting rulings on issues of law or fact plainly existed.

Defendants argue that the trial court erred in relying upon the plaintiffs’ complaint to find the possibility of conflicting rulings.  Defendants insist that plaintiffs were required to make an evidentiary showing and that, having failed to do so, could not avoid enforcement of the arbitration provisions.  Defendants rely upon Segal v. Silberstein (2007) 156 Cal.App.4th 627, 633, which states:  “Section 1281.2 creates a summary proceeding for determining whether the parties should be ordered to arbitrate.  The petitioner bears the burden of proving the existence of a valid arbitration agreement by a preponderance of the evidence.  The opposing party must meet the same evidentiary burden to prove facts necessary to its defense.”  This principle has been applied to questions concerning the existence and scope of an arbitration agreement.  (E.g., American Federation of State, County & Municipal Employees v. Metropolitan Water Dist. (2005) 126 Cal.App.4th 247, 257.)  But the imposition of an evidentiary burden has not been applied, and we would find it difficult to apply, to the portion of section 1281.2, subdivision (c) requiring that the trial court find the “possibility” of conflicting rulings on legal or factual issues.  Indeed, courts have routinely relied on the allegations contained in the operative pleading to determine whether there is the possibility of conflicting rulings within the meaning of section 1281.2, subdivision (c).  (E.g., Best Interiors, Inc. v. Millie & Severson, Inc., supra, 161 Cal.App.4th at p. 1330 [relying on the plaintiff’s “allegation” and “claims” to find the possibility of conflicting rulings on agency and ratification]; Fitzhugh v. Granada Healthcare & Rehabilitation Center, LLC, supra, 150 Cal.App.4th at pp. 475-476 [finding the possibility of conflicting rulings on the basis of the inclusion of a claim alleging a violation of Patients Bill of Rights contained in title 22, section 72527 of the California Code of Regulations]; C.V. Starr & Co. v. Boston Reinsurance Corp. (1987) 190 Cal.App.3d 1637, 1641 [explaining that “[t]he very nature of the controversy here fully supports the trial court’s decision” to deny a motion to compel pursuant to § 1281.2, subd. (c)].)  We construe this authority as supporting the trial court’s reliance on the allegations of the complaint to determine that there was a possibility of conflicting rulings if defendants’ motion to compel arbitration were granted.

The trial court properly concluded that the action involved common issues of law and fact.  “The existence of this possibility of conflicting rulings on a common issue of fact is sufficient grounds” to deny a motion to compel pursuant to section 1281.2, subdivision (c).  (Henry v. Alcove Investment, Inc., supra, 233 Cal.App.3d at p. 101.)  Of course, the trial court could have addressed the possibility of conflicting rulings by other means, for example, by ordering arbitration among defendants and the many plaintiffs who agreed to arbitration and staying the court action pending the outcome of the arbitration proceeding.  (§ 1281.2.)  The court did not do so here, and defendants have not argued on appeal that the court abused its discretion in choosing among the alternative means of addressing the situation.  Defendants’ argument is that the court erred in finding that there was any possibility of conflicting rulings on common issues of law or fact.  We reject that argument.

iiI.  dispostion

The order is affirmed.


[1] The statement of facts is, in substantial part, a repetition of facts previously summarized in our writ review of a related order.  (Tarrant Bell Property, LLC v. Superior Court, supra, 179 Cal.App.4th 1283, review granted Feb. 18, 2010, S179378.)

[2] In calculating the number of plaintiffs subject to ADR provisions, plaintiffs rely upon party dismissals and a first amended complaint filed after the order to compel arbitration was denied, and ask us to take judicial notice of these documents.  We deny the request for judicial notice because the documents are irrelevant to this appeal.

[3] The lease arbitration and reference clauses are typed in all capital letters.  We do not follow that capitalization scheme when quoting those clauses here.

[4] All further statutory references are to this code.

[5] Defendants argue that the proper standard is not abuse of discretion but de novo in the absence of any evidentiary conflict.  We conclude that the trial court’s decision is correct under either standard.



By Steven G. Mehta

When China chooses to do anything, it usually does it in wholesale fashion and on a large scale.  When it comes to manufacturing, China is the it country, when it comes to making technological and cultural advances, China is the country; when it comes to creating an amazing olympics, China is the country.  And, now when it comes to mediation, China is soon becoming a superpower in dispute resolution.

According to a recent article, in the past 30 months, China has resolved over 8 million disputes through mediation in the court system.  According to the Chinese Chief Justice, mediation is playing a significant role in resolving disputes.  To read the complete article, see the following link.

 

Court Mediation Solving more Civil Cases, Social Conflict.

Steve’s Book

Get Your Updates Automatically, Click Below to Subscribe

XML
Google Reader or Homepage
Add to My Yahoo!
Subscribe with Bloglines
Subscribe in NewsGator Online

Subscribe in myEarthlink

Archives

Advertisements